Saturday 30 May – Wed 3 June 2026
Saturday was a full on work on the project day and Sunday a
day of rest. A grocery shop in the morning and a bit of measuring up in the
afternoon, before the mandatory G nT under the cherry tree.
Monday, and Willie turns up at 0600 as promised. The sun was
just coming up. He and the boy worked without hats, water, food or breaks until
2 pm, laying the concrete block foundations, on top of the 500 mm deep
reinforced concrete foundations. Bloody hell, they build like the Romans! Well…
they were conquered by good old Julius and there are a lot of very long,
straight roads. Anyway, very interesting to watch.
We, on the other hand, continued with the timber planking of
the woodshed. A long day. Roast chicken on the BBQ for dinner. And so it
continues, creeping slowly to a complete woodshed.
At 10.00 AM Wednesday the last bolt went into the beam and
the woodshed is complete!
New shed
Old shedStill doing it tough.